18: Record Modelling#
Description#
Record Modeling is the process used to depict an accurate representation of the physical conditions, environment, and assets of a facility. The record model should, at a minimum, contain information relating to the main architectural, structural, and MEP elements. It is the culmination of all the BIM Modeling throughout the project, including linking Operation, Maintenance, and Asset data to the As-Built model (created from the Design, Construction, 4D Coordination Models, and Subcontractor Fabrication Models) to deliver a record model to the owner or facility manager. Additional information including equipment and space planning systems may be necessary if the owner intends to utilize the information in the future.
Potential Value#
Aid in future modeling and 3D design coordination for renovation Improve documentation of environment for future uses, e.g., renovation or historical documentation
Aid in the permitting process (e.g. continuous change vs. specified code.)
Minimize facility turnover dispute (e.g. link to contract with historical data highlights expectations and comparisons drawn to final product.)
Ability for embedding future data based upon renovation or equipment replacement
Provide owner with accurate model of building, equipment, and spaces within a building to create possible synergies with other BIM Uses
Minimize building turnover information and required storage space for this information
Better accommodate owner’s needs and wants to help foster a stronger relationship and promote repeat business
Easily assess client requirement data such as room areas or environmental performance to as-designed, as-built or as-performing data.
Resources Required#
under development
Team Competencies Required#
Ability to manipulate, navigate, and review 3D model
Ability to use BIM modeling application for building updates
Ability to thoroughly understand facility operations processes to ensure correct input of information
Ability to effectively communicate between the design, construction, and facilities management teams
References for Additional Information#
Brown, J. L. (September 2009). Wisconsin Bets on BIM. Civil Engineering , 40-41. CRC for Construction Innovation. Adopting BIM for Facilities Management - Solutions for Managing the Syndey Opera House. Gregerson, J. (December 2009). For Owners, BIM Has Vim. Buildings , 26. Knight, D., Roth, S., & Rosen, S. (June 2010). Using BIM in HVAC Design. ASHRAE Journal , 24-34. Madsen, J. J. (July 2008). Build Smarter, Faster, and Cheaper with BIM. Buildings , 94-96. McKew, H. (July 2009). Owners, Please Demand More From Your IPD Team. Engineered Systems , 50. Woo, J., Wilsmann, J., & Kang, D. (2010). Use of As-Built Building Information Modeling. Construction Research Congress 2010 , 538-548.
Potential Output Information#
Model including Facility Management Information
Facility Asset List for Input into Facility Management System
Source: BIM Project Execution Planning Guide, Ver. 2.2 with minor revisions.